Section 42 has you construct the rear seat back from various pieces included in the fuselage kit. We decided to use the seat back designed by Cleaveland Aircraft Tool. This is a 60/40 seat with a head rest similiar to the front seats. These frames were primed and then had the bottom hinge attached. This took about 3 hours on Oct 27, 2012.
Section 40, Flap System Install
Section 39, Control System
Section 36, More Brake Lines
Continued with running tunnel brake lines and measured the brake lines for the Control Approach Pedals. I am ordering the brake lines from Bonaco. Spent 7 hours doing this on Oct 6th.
QTY 2: -3 Hose assy w/clear at 37
Section 35, Side Panels
Spent a day (9 hours) or so prepping and painting the interior panels in the fuselage. Not much to say here but lots of dimpling and nut plate attachments. Finished installing right passenger seat floor pan that was shipped wrong in the fuselage shipment and had to wait until the Finish kit arrived with the replacement part. No pictures except for Casey playing after the parts had dried.
Section 36, Brake Lines
Finish Kit Arrived
The Finish Kit arrived today. It’s exciting but sadly I’m not ready for it. Slow progress on the fuselage kit since I’ve been working the 787 project at work and Dana is on her last semester at UTMB for her double Masters certificate program for becoming a Adult and Geriatric Nurse Practitioner. All of this plus our 13 month old is a joy and handful all at the same time. Busy, busy times!! Finished the inventory process.
Section 33 & 34, work
I worked the baggage area and rear seat floors up to the point of needing to prime the parts, page 33-4. As you can see from the pictures i had my little helper with me. I then jumped over to assembling the baggage door and stopped prior to final drilling the parts. I will continue work on these section later in the week. I spent about 5 hours on this so far.
Section 30, Step Installation
Section 30 went fairly quick except for needing to re-drill the left step AN3 bolt to an AN4 bolt. When the AN3 bolt was drilled I enlarged to hole by not holding the drill properly and therefore the step was loose from the bolt fitting loose in the drilled hole.
Spent about 4.5 hours working this section. Had to remove most of the epoxy paint on the step that goes into the fuselage for it to fit into the mounts. I installed the step tube spacers to provide a better grip on the tube and possible fix the known step wiggle issue.






















RV10 Building Adventure