Feb 10, 2013, (2.5 hours) Worked on figuring out how to install the Flighline AC Evaporator. I essentially centered the evaporator up high on the baggage bulkhead wall. I then used some of the predrilled holes on the left side of the evaporator and matched drilled those into the bulkhead wall. On the left side there where no pre-drilled holes so added my own. I added nut plates on the back side of the baggage walls. I still need to create a small around the low and high pressure lines of the evaporator panel that can be removed and add a port thru the baggage wall out to the condensor cooling air outlet.
Flightline AC System
Feb 2-3, 2013 (8 hours) I worked with installing the Flightline AC system firewall pass thru. I finally decided on the best location for the pass thru that was different from most all other RV10 installations based upon my location of the firewall battery, master contact relay, and future battery pass thru. I drilled the thru holes and then applied Bio-therm and attached the pass thru to firewall. I then installed the battery pas thru located very near the same locations since I had all the required tools in hand. I then installed the two different size hose on the aft size of the firewall. I once again used a different configuration than most other installations because of the pass thru locations. I used two 45* hose attachments on the aft side and two 90* hose attachments forward of the firewall. I installed the crimp clamp on the aft side of the firewall and re-situated the hose that run aft to the AC unit.
I received the evaporator core that will be mounted on the inside of the baggage bulkhead. This “again” is not done as others have done before since the idea is to help move the weight more forward and also to place the intake of the evaporator directly into the “conditioned air” environment. There had been reports of other installs that were not able to keep the system tightly sealed and thus caused poor performance of the AC system. This different install will certainly create new install challenges but I think overall this will work well. I will need to trim the Aerosport overhead so the evaporator will slide up into it for better alignment. A shroud duct will need to be made to cover and join together the area. Further updates to come.
Section 46, Engine Mount
Feb 2nd, 2013 I reinstalled the engine mount for the last time (4 hours). I read Section 46 for installing the engine and I will have to say the instructions are horrible. I drilled and mounted the engine mount using one hole. I then continued to the next hole only to find the hole alignment was off by half a hole. After further investigation all the holes were off by a lot. The plans tell you to align the engine mount to the other holes and use the engine mount as a drill jig to finish enlarging the original prepunched holes in the firewall. Well had I done that the engine would likely be mounted half a hole off to the right side. I used the engine mount as a drill jig and continued to drill the holes one by one with no other bolts installed in any of the engine mounting locations to the proper 3/8″ size. After doing this I held the engine mount in place and as expected the engine mount holes were off. I decided (wished I would had done this prior) to look on the chat groups to find the mounting engine discussion. From what I gathered, the engine mont behaved as most all others did and that folks essential worked with the bottom 4 holes first. The two bottom most inner holes align the best so the suggestion was to bolt one of these holes and then re drill the adjacent hole. This allowed the engine mount to be center. Working my way to the lower side holes I was able to re drill those holes with only a slight enlarging of the firewall side of the hole with the aft side of the firewall hole still perfectly in shape. After finishing this I moved to the top engine mount holes. These put up a little mor fight but I was able to lightly persuaded them into place and then re-drilled them as needed. All bolts and hardware installed and torqued to specs.
Aft 12Volt Aux Battery Power and associated Terminal/Fuse Block
This weekend (Jan 27, 2013) I spent 9 hours working on various aspects of installing the remaining aft section of the 4 AWG wire coming from the Tunnel AUX Battery. I started by installing a Blue Sea ST Blade Fuse Blocks (Overton’s p/n: 71230) that includes a negative bus and positive bus. Max amperage is 100 Amps the block can handle. Max amperage is 30 Amps per circuit.
Before I could mount the block where I finally decided to mount it, I had to remove my previously modified battery box location that was modified to hold two batteries since I did not need the extra weight back there. I drilled out the rivets holding the double battery mount to remove it. Once I did this, I had clear access to where I wanted to mount the fuse block.
I mounted the fuse block and then terminated the 4 AWG switched wire coming from the Tunnel AUX bus and terminated a 4 AWG ground wire to the block. I then moved onto creating a support bracket to hold the wires and conduit exiting the aft baggage deck.



Flight Line Air Conditioning Condenser Fit/Temp Install
This weekend (Jan 26, 2013) I decided to work on the Flight Line Air Conditioning Condenser and associated wiring. I spent several hours attaching the condenser to the mounting tray (only took a couple of minutes) and then spent most my time on the electrical connection from the condenser fan to the Relay and then down to the power source. I epoxied some wire attach point to the carbon fiber plenum to help with wire management. I mounted the relay to the tray since the wires from the power wire from the condenser fan can connect directly to the rely without being lengthened. I then routed the ground wire from the condenser and power wire from the relay to the power block below both of them.
I worked on routing the control wire from the Flight Line AC controller thru the fuselage from Front to aft. I have yet to terminate any of these wires since placement of the evaporator is not known yet. I am still awaiting my shipment of the evaporator and hope to receive it this week so I can start work installing it.
I spent many hours trying to figure out the proper location for the AC low and high pressure hose thru the firewall. This is frustrating since every location seems to have interference since I mounted a firewall battery and contractor up there. To add frustration, I don’t have the proper oriented hose fitting I would like to use for the install. The bag sent includes a bunch of angled fitting but I have no technical data to substantiate where they go. I will contact Flight Line and see what I can figure out.
Total hours spent 10 hours.
Tunnel Battery Relay Contact and 4 AWG wire routing Forward and Aft
Jan 13, 2013, I spent (8 hours) much of my time drilling various holes to mount cable tie brackets and Adel clamps. I started with drilling mounting holes throughout the aft tunnel where the control tubes are located. I secured the 4 AWG wire on the port side of the aircraft to the vertical side walls every couple of inches so the wire would not interfere with the control cables.
I then focused my attention to the center tunnel where the contact relay is located and begin to terminate the 4 AWG wire to the proper ring terminals and placed heat shrink tubing around the wire to add rigidity and protection from electrical contact with other items near by. After working with how I would route the 4 AWG wire forward towards the firewall I then continued to drill holes to mount Adel clamps for holding the wire run.
The wire run in the mid tunnel is verified to not interfere with the flight controls. everything is clamped with Adel clamps and clearance is maintained throughout the flight control area.
A 20 amp circuit breaker is mounted in the same general area of the contact relay to provide protection for the power wire for one of the Plasma Electronic Ignitions. The power source comes directly from the battery to the fuse then up to a switch that can select either the Tunnel or Firewall battery as a power source. Then the wire connects to a 7.5 Amp circuit breaker and then an Ignition switch and then onto the Ignition module. />
Firewall Battery mount and support
Jan 19, 2013 I worked on adding a firewall mounted battery box (9 Hours). Vans sales a firewall battery mount kit for the PC680 battery so I decided to buy it. It was interesting reading the plans for the battery box versus the plans for the RV10, very different! After drilling many holes in the battery box to decrease the weight being added I moved to creating a support structure for the firewall. I used to angle aluminum pieces with various mounting holes and nut plates to attach the battery box and to attach the support structure to the firewall. I again drilled lightning holes in the angle aluminum to decrease the weight but maintain structural integrity. I then used bio-therm so seal the holes thru the firewall.
Section 45, Door Fitting – Seal, plus tunnel access cover
December 27-28th, I continued to work on fitting the McMaster door seal to the door openings. I cut a piece of the seal and put epoxy mixture inside of it and pushed it into place. I allowed this to cure and then continued with the remaining portion of the doors after pulling the seal off and cleaning up the rough excess epoxy. This method allowed a nice holding edge to be formed for the seal so hopefully it won’t slip off later.
I also worked on the tunnel and added the access panel to the left side. I have decided to put one of the PC680 batteries in the tunnel since the air conditioning unit is behind the luggage bulk head. It has been discussed before about the CG issues of the RV10. With weight of the AC unit and the oxygen equipment in the back. It is highly likely I will encounter a CG issue before I reach gross weight so the batteries need to be moved forward. If it is determined that a battery needs to be moved aft, the original battery location is reserved for exactly this type of scenario. Either way we should be able to cover the CG issue once the aircraft is totally built out. There will be a PC680 mounted on the firewall also.
Consideration needs to be given to the fact that the correct choice of prop needs to be made to help control the total weight and CG requirements. Either the Hartzel or MT 3 bladed prop will be my choice.
Spent 7 hours working mostly all the above mentioned work.
Section 37, Fuel System – Andair Fuel Valve
December 28, Sectioned the tunnel cover into 3 different section. First section is forward of the brake pedals, second section was from aft brake pedal system to where the fuel valve is mounted. The third section is aft the fuel valve to the end of the original tunnel cover. This allows easier access to all the tunnel sections and allowed the fuel selector valve to be mounted much higher in the tunnel to allow a better fit with the carbon fiber center armrest. Spent 4 hours
Section 38, Rudder Pedal after market Brake Lines
I purchased the Bonaco brake lines for the after market Control Approach system. The Bonaco lines fit well and function with the movement of the pedals well. Spent 1 hour fitting them on December 15th.
QTY 2: -3 Hose assy w/clear at 37




























RV10 Building Adventure